Skip to content

Glasgow Apollo 3d Update

  • by
Glasgow Apollo 3d

Hi everyone and welcome to the latest Glasgow Apollo 3d build update.

After loosing a week to illness, we’re back on track. Good progress has been made, with a full redesign of the West End Misfits shop, and all stalls exits added.

Most of the work has centred around the auditorium, in a bid to make progress on that area.

The following have been added;

  • High gold columns
  • Upper boxes and plaster moulding
  • Low ceiling at the rear of the stalls
  • Auditorium ceiling
  • plaster relief above the stage.

Next week I’ll be concentrating on building the lower circle foyer along with office buildings at the front.

Glasgow Apollo 3d video update.

Leave a Reply